Sleek Apparels

Manufacturing for Australia

T-Shirt & Apparel Manufacturer for Australian Brands

Australian brands can produce custom apparel from 50 pieces per knitwear style, with production 12–15 days after sample approval. Transit is 3–6 days by courier, 6–10 days by air, or roughly 20–30 days by sea into Port Botany, Melbourne, Brisbane or Fremantle — one of the shorter ocean lanes from Bangladesh. Quotes are door-to-door with freight included; import duty and 10% GST are settled by you at the border.

  • MOQ: from 50 pcs (knits)
  • Production: 12–15 days
  • Air transit: ~6–10 days
  • Door-to-door, freight included

Itemised quote usually within 24 business hours • Sample fees credited back in full on bulk orders • No commitment required

Australia's streetwear and surf-adjacent brands live on exactly what Bangladesh does best: heavyweight cotton tees, washed finishes, and fleece. Bangladeshi garments also qualify for zero duty under Australia's preferences for least-developed economies — though claiming that rate needs an origin declaration we are not registered to issue, so budget the standard rate.

Sea transit from Chattogram to the east coast runs shorter than to Europe or America — around three to four weeks — which makes sea freight viable even for mid-size orders, and your mornings overlap our late morning for same-day communication.

Two Australian specifics worth planning around. GST applies to imported goods at 10%, and above the A$1,000 threshold it is assessed at the border rather than collected by the seller — so a commercial run is a border transaction and needs an ABN and a customs broker, even where a sample consignment would not. And the calendar runs the other way: your winter fleece programme is being made while the northern hemisphere is cutting swim, which is an advantage on capacity and lead time if you book to it. Our sourcing calendar is hemisphere-aware for exactly this reason.

Sourcing window · Southern hemisphere

Australia: currently making Spring/Summer 2026/27

This market runs the southern-hemisphere calendar, inverted against every other market on this site — summer sells over Christmas, and winter falls mid-year.

The season on the line right now is Spring/Summer 2026/27, which means lightweight knits — oversized tees, shorts, polos and caps. Stock has to be landed for Christmas and peak-summer selling on , and production plus transit is what sets the order-by dates below.

Scroll horizontally to see all columns
Latest order date by freight route for Spring/Summer 2026/27 stock, landed for Australia buyers by 1 Dec 2026.
RouteOrder byOrder to landedStatus
Sea freightlowest unit cost~65 daysincl. 30 days transitClosed
Air freightwhen the vessel has sailed~45 daysincl. 10 days transitClosed
Express couriertop-ups and samples~41 daysincl. 6 days transitOpen

Sea freight and Air freight have closed for this landing date — the last order that would have made it was 17 Oct 2026. Express courier still lands in time if the order is confirmed by 21 Oct 2026, and the Autumn/Winter 2027 window below is open on every route.

Next up: Autumn/Winter 2027

The range launch falls on , which shifts the mix to fleece and layering — hoodies, sweatshirts, joggers and knitwear. Sea freight for it needs the order confirmed by 26 Jan 2027. Development and sampling sit in front of production, so most buyers open that conversation a month before the date.

See the full sourcing calendar — both hemispheres, every season

Order-by dates assume the slow end of every published range: 35 days from order to shipment, plus the longest transit we quote on that lane. Washed and garment-dyed programmes add 3–5 days, and custom knit adds 7–10 days — order ahead of the date if yours includes either.

How do we ship apparel to Australia?

Scroll horizontally to see all columns
MethodTransitBest for
Express courier3–6 days door-to-doorSamples and small drops
Air freight6–10 daysUrgent restocks
Sea freight~20–30 days to Sydney/Melbourne/BrisbaneBulk — unusually fast from Bangladesh

Ports & customs handling for Australia

Scroll horizontally to see all columns
RoutePorts / gatewaysNotes
SeaSydney (Port Botany), Melbourne, Brisbane, FremantleRoughly 20–30 days — one of the shorter lanes from Chattogram
AirSydney, MelbourneSamples and launch drops
Customs handlingCommercial invoice, packing list, certificate of originWhat your broker needs to clear the goods — budget the standard rate plus GST

Duties & import costs

Bangladeshi-origin garments qualify for zero duty under Australia's tariff preferences for least-developed countries, but the rate is claimed against an origin declaration we are not registered to issue — so budget the standard apparel rate. GST applies at import as normal. We provide the standard clearance documentation with every shipment.

Model your landed cost to Australia — freight, duty, and clearance on one screen, or request a Australia manufacturing quote and we’ll price it exactly.

FOB, CIF and DDP explained — who pays what, and where the duty lands

What does a Australia sourcing programme cost?

Quotes in USD by default. Approximate examples at recent rates: basic tees from ~A$3.80–6.80/pc, heavyweight tees ~A$6–10.60/pc, hoodies ~A$12–22.60/pc (FOB, moderate volume).

Currency examples are approximate conversions at recent exchange rates — quotes fix the exact figure.

What is included in Australia programmes?

  • Washed and garment-dyed programs — the finish Australian streetwear runs on
  • UPF-conscious fabric options for outdoor and surf brands
  • Sea-freight-first cost planning given the short Chattogram–Australia lane

What do Australia procurement teams ask?

Why do Australian brands source from Bangladesh instead of China?

Two reasons stack up cleanly: world-class heavyweight cotton knits at lower cost, and a sea lane of only 3–4 weeks. A third gets oversold across this industry, so here it is with the caveat attached — Bangladeshi garments qualify for zero duty under Australia's LDC preferences, but claiming it needs an origin declaration we are not registered to issue, so budget the standard rate. For tee-and-fleece brands the first two are enough on their own.

What's the real timeline to Melbourne or Sydney?

First order: 4–8 weeks of development and production, then ~3 days (courier) to ~4 weeks (sea) in transit. Many clients air the launch quantity and put the rest on the water the same week.

Do you handle GST and clearance?

Clearance is handled by you or your forwarder. Our unit price includes freight to your door, but Australian GST and any duty are settled by you at import — we do not offer DDP. We supply the commercial invoice, packing list, and certificate of origin your broker needs.

Do I need an ABN and a customs broker to import a bulk order?

For a commercial consignment over A$1,000, effectively yes. Above that threshold the goods need a full import declaration, GST is assessed at the border rather than collected by the seller, and an ABN registered for GST is what lets you claim the input tax credit back rather than wearing the 10% as a cost. A broker is not legally compulsory but is worth the fee on a first entry — a misdeclared fibre content on an apparel line is the most common reason a container sits. Sample shipments under the threshold clear far more simply, which is part of why we suggest running the first round as samples.

How does the southern-hemisphere calendar change my ordering?

It moves every deadline six months against the industry's default advice. Your winter fleece has to be in production while northern brands are cutting summer, and your summer tees while they are cutting outerwear — which is genuinely an advantage, because you are booking capacity in our quieter window rather than competing for it. The practical version: work backward from your on-shelf date by roughly 20–30 days of sea transit plus 12–15 days production plus 7–10 days sampling, and add a fortnight of slack for a first order. Our sourcing calendar computes these dates per hemisphere so you are not doing that arithmetic yourself.

Which fabrics suit Australian conditions?

For tees, combed ring-spun cotton at 240–280 GSM holds a boxy shape without the weight becoming uncomfortable, and garment-dyed or enzyme-washed finishes suit the worn-in look most Australian streetwear runs on. For anything with real sun exposure, tighter knit construction and darker or more saturated shades give meaningfully better UV protection than a loose light-coloured jersey — we can specify fabric to a UPF target and have the mill test to it, though the rating belongs to the tested fabric and we will not print a UPF claim on a garment we have not had tested. Fleece for southern winters runs 350–450 GSM brushed back.

How can you start a Australia apparel programme?

Tell us what you’re making and where it’s going — your quote includes shipping options and landed-cost guidance for Australia.

Our minimum is from 50 pieces per style, all year.

PDF, images, Word, Excel or ZIP. Up to 5 files, 15 MB each. Your files stay private to Sleek.

Itemised quote usually within 24 business hours • Sample fees credited back in full on bulk orders • No commitment required

We reply to every inquiry within 24 hours, Monday–Saturday. Your details are never shared.

What manufacturing specifications can Australia buyers lock?

Manufacturing specifications for Australia buyers
SpecificationWhat we commit to
Minimum orderFrom 50 pieces per style for knitwear — woven from 300 pieces per style, 25 pieces per colour for garment dyeing
Lead time25–35 days from order to shipment — 12–15 days on the line for orders up to 2,000 pcs
SamplingUSD 60 blank / USD 85 branded, + USD 45 shipping — credited against bulk
Payment terms50% before production, 50% before shipment
DecorationScreen printing in-house; DTG and embroidery via partner factories
CertificationBSCI certified facility
ShippingDoor-to-door delivery, freight included in unit price

Ready to talk it through?

Send a tech pack, a sketch, or just a reference photo and we'll come back with itemised pricing within 24 hours. Minimum order is from 50 pieces per style.

Ready to Start Your Production?

Get an itemized, factory-direct quote within 24 hours — fabric options, decoration costs, timelines, and shipping, all priced out.

Itemised quote usually within 24 business hours • Sample fees credited back in full on bulk orders • No commitment required

Evaluate quality in your market: A physical sample, couriered worldwide, with the cost credited against bulk. Request a sample from USD 60.

Plan your shipment: Shipping routes & customs guide·Estimate landed cost·Direct regional desk